Manufacturer & exporter · FOB / CIF / CFR · Bulk Suppliers Worldwide
Machines Equipments Search

Export market

Industrial machinery
exported to Malaysia

Discharge ports Port Klang (Westports and Northport); Penang
Supply 230 V / 50 Hz
Plug type Type G
Conformity No PVoC; Energy Commission approval covers...

Divisions supplied to Malaysia

The whole catalogue →

1 of these has a page written for Malaysia; the rest link to the full range in each division.

Supplying Malaysia

A Malaysian buyer who asks which SIRIM certificate a production line needs can have a plain answer: none. Approval under the Electricity Supply Act 1990 takes the form of a Certificate of Approval from the Energy Commission. It runs to 34 categories of domestic and low-voltage goods sold directly to the public, and the guideline behind it excludes, in terms, types promoted exclusively to industry or commerce. The SIRIM label follows that certificate, so where none is owed there is no label.

The boundary is the useful part:

  • outside the scheme, a processing line, an item of construction plant, an industrial refrigeration pack, machinery in HS 84 generally;
  • inside it, a packaged air conditioner at or below 32,000 Btu/hr, a domestic-pattern refrigerator or freezer, and the domestic plugs and cordage that travel with a machine.

The application is the local importer's either way, not a paper a Chinese works can hold for a customer, and nothing is verified before shipment here.

Fitness certificates changed statute in 2022

Machinery safety law moved house. The Factories and Machinery (Repeal) Act 2022 repealed the 1967 Act, and registrations, approvals and certificates of fitness now sit under the Occupational Safety and Health Act 1994, administered by DOSH. Pressure vessels and hoisting machines still need design approval and a certificate of fitness, but paperwork citing the 1967 Act is out of date.

Hong Kong is not an ACFTA party

Preference runs on Form E with 40 per cent regional value content, and the form must reach Malaysian Customs within four months of endorsement, six where the goods passed through a non-party. MITI's position is that Hong Kong is not party to the agreement. Mainland goods landed and reshipped through it therefore need a properly issued back-to-back certificate of origin and evidence of direct consignment, or the buyer pays the most-favoured-nation rate. MITI's guidance contradicts itself on third-party invoicing, so get a written ruling from the Royal Malaysian Customs Department before building a triangular invoice. Duty may fall away regardless, the Malaysian Investment Development Authority granting exemption from duty and sales tax where machinery is not produced locally.

Where the tender bands cut

Federal supplies and services are bought through ePerolehan at home.eperolehan.gov.my, works notices going on the CIDB e-advertisement system. Value decides eligibility before anything technical is read. Under RM20,000 no ministry registration is called for; up to RM50,000 any registered local supplier may offer; from RM50,000 to RM100,000 the work is reserved to registered Bumiputera companies; from RM100,000 to RM500,000 a Bumiputera price preference runs; above that the tender opens. Registration presupposes a locally incorporated entity, and Malaysia only observes the WTO procurement agreement, so no treaty route gets around this.

Discharge, supply figures and charged units

Send import cargo to Port Klang, comprising Westports and Northport, which moved 14.64m TEU in 2024. Tanjung Pelepas in Johor ranks higher globally but is predominantly transhipment and the wrong default for an import; Penang serves northern cargo, and Kuching and Kota Kinabalu serve East Malaysia. Single-phase supply is nominally 230 V at plus 10 and minus 6 per cent, three-phase 400 V, 50 Hz within 1 per cent, on Type G fittings. The declaration is Customs Form K1, and English is accepted. Refrigerant needs settling early: HFCs joined the control lists on 1 March 2020 and importing them needs a Department of Environment licence, while whether a pre-charged unit is caught is worth confirming before it ships. Replacement parts and field servicing are not part of this business; an installation visit, training or warranty cover exists only where the supply contract records it.