Manufacturer & exporter · FOB / CIF / CFR · Bulk Suppliers Worldwide
Machines Equipments Search

Processing Plant

Food Tomato Processing Plant

Code MACHEQ-F-M10001014 Raw material handling capacity (t/d) 60 Evaporation Form Double vacuum
Food Tomato Processing Plant
  • Built to tender specification Capacities and configuration to your schedule
  • FOB · CIF · CFR Quoted to your destination port
  • Single units or bulk One machine or a full container
  • Export documentation What customs at your end will ask for

Specification

14 values
Raw material handling capacity (t/d)
60
Evaporation Form
Double vacuum
Water Consumption
7.1
Power (kw)
83.8
Steam Consumption (t/h)
1.665
Compressed Air Consumption (t/h)
66.2
Cooling Water Consumtion (t/h)
125
Raw material handling capacity (t/d) (options)
60 / 150 / 250 / 500 / 750 / 1000 / 1250 / 1500 / 2000
Evaporation Form (options)
Double vacuum
Water Consumption (options)
7.1 / 13.1 / 21.6 / 44.3 / 65.7 / 44.3 / 65.9 / 65.9 / 79.08
Power (kw) (options)
83.8 / 151.5 / 412.4 / 636.2 / 955.4 / 1291.6 / 1411.1 / 1558.1 / 1869.7
Steam Consumption (t/h) (options)
1.665 / 3.87 / 5.22 / 9.14 / 15.01 / 20.2 / 24.62 / 29.15 / 34.98
Compressed Air Consumption (t/h) (options)
66.2 / 66.2 / 66.2 / 72.2 / 72.1 / 72.2 / 72.2 / 72.2 / 86.84
Cooling Water Consumtion (t/h) (options)
125 / 317 / 307 / 585 / 825 / 1075 / 1410 / 1630 / 1956

Standard model shown. Capacities, dimensions and configuration are built to tender specification on bulk orders. Warranty, installation service and operator training are agreed in the supply contract - send your requirement and we will quote against it.

About this unit

Food Tomato Processing Plant is manufactured and exported by Machines Equipments as part of our Food Processing Equipment Line Machines Plants range. Key figures for this model include a rated capacity of (t/d) 60 150 250 500 750 1000 1250 1500. Full technical detail is set out in the specification below. Listed under Processing Plant. Supplied individually or in bulk, specified to the electrical requirements of your market and shipped with the documentation customs will ask for. Send the output you need per hour and the destination port for a delivered price and a lead time.

Also in this range

All 23 →