
Construction 1.7m3 Wheel Loaders
A Construction 1.7m3 Wheel Loaders uses a front-mounted bucket on a hydraulic lift arm to scoop, carry and dump loose material such as aggregate, soil or demolition debris, and can also load trucks and hoppers directly. It is used on construction, quarry and material-handling sites for stockpile work and truck loading. Its articulated steering lets the whole front and rear frame pivot for a tight turning radius despite a large bucket at the front. For tender or institutional supply, share the technical spec and delivery date from your award and we'll confirm certification paperwork and a matching production schedule.
- Ofumaan hojjechuu fi to'annoo: Hydraulic loader arm, operator cab controlled
- Ijaarsa: Steel bucket with hardened cutting edge
- Humna / mala hojii: Diesel engine, articulated steering, hydraulic lift arm
- Dandeettii waliigalaa: 1.7-6.5 m³ bucket capacity, 3-12 tonne rated operating load
| Gosa | Maashinaalee fi Meeshaalee Ijaarsaa |
| Gosa Xiqqaa | Wheel Loader |
| Sadarkaa Ofumaan Hojjechuu | Hydraulic loader arm, operator cab controlled * |
| Humna / Mala Hojii | Diesel engine, articulated steering, hydraulic lift arm * |
| Meeshaa Ijaarsaa | Steel bucket with hardened cutting edge * |
| Dandeettii / Hangaa | 1.7-6.5 m³ bucket capacity, 3-12 tonne rated operating load * |
| Loading Bucket | 1.7 m3 |
| Rated Loading | 3 ton |
| Engine Power | 92 kw |
| Operating Weight | 10500 kgs |
| Overall weight | 10500kg |
| Bucket capacity | 1.7m3 |
| Maximum grade ability | 30℃ |
| Maximum dump height | 3150mm |
| Maximum dump reach | 1200mm |
| Engine model | Weichai-Deutz WP6G125E22 |
| Engine Rated power | 92kw / 2200r/min |
| Gearbox mode | power shift |
| Gears | 2 forward, 1 reverse |
| Maximum speed | 40km/h |
| Argamuu | Kuusaa keessa jira / Gaafatamee tolfama |
| Paakeejjii Al-ergaa | Saanduqni geejjiba doonii dandeessisu ni argama |
| Waadaa Tajaajilaa | Akkaataa haala oomsituutti — yeroo gaafannutti mirkaneessaa |
* Kun gatii waliigalaa gosa meeshaa kanaati, lakkoofsa gita meeshaa dhuunfaa tokkoo sirrii ta'e miti — ulaagaa sirrii ajaja keessaniif yeroo gaafattanitti mirkaneeffadhaa.
Wal bira qabuu
Kun akkamitti oomishaalee Maashinaalee fi Meeshaalee Ijaarsaa biroo waliin wal bira qabama
| Moodeela | Ofumaan Hojjechuu / Humna | Meeshaa | Dandeettii |
|---|---|---|---|
| Construction 1.7m3 Wheel Loaders (fuula kana) | Hydraulic loader arm, operator cab controlled | Steel bucket with hardened cutting edge | 1.7-6.5 m³ bucket capacity, 3-12 tonne rated operating load |
| Construction 12 Ton 6.5m3 BUCKET Largest Wheel Loader | Hydraulic loader arm, operator cab controlled | Steel bucket with hardened cutting edge | 12 ton |
| Construction 12 Ton Wheel Loaders | Hydraulic loader arm, operator cab controlled | Steel bucket with hardened cutting edge | 12 ton |
| Construction 3 Ton 1.7m3 BUCKET Wheel Loader | Hydraulic loader arm, operator cab controlled | Steel bucket with hardened cutting edge | 3 ton |
Kanas ni barbaachisa taha
Oomishaalee Walitti Dhufeenya Qaban
Gaaffilee Bittootaa
Gaaffilee waa'ee Construction 1.7m3 Wheel Loaders
Eeyyee — dandeettii, ulaagaa humnaa fi meeshaalee dabalataa Construction 1.7m3 Wheel Loaders akka barbaachisummaa keessaniitti qindeeffamuu ni danda'u. Yeroo gaaffii keessan dhiyeessitanitti oomisha galmaa fi biyya galmaa isin barbaachisu nuuf himaa.
Ajajni al-ergaa paakeejjii geejjiba doonii dandeessisu, ragaa geejjibaa, akkasumas yeroo barbaachisu, kitaaba hojii waliin ni dhiyaata. Haalli fe'insaa fi tajaajila gurgurtaa booda yeroo ajajni godhamutti mirkanaa'a.
Meeshaalee gosa kanaa ammaan tana gara biyyoota 67+ Afrikaa, Eeshiyaa, Bahaa Giddu-galeessaa fi Ameerikaa Latinii keessatti argamaniitti geejjibna — yeroo gaaffii keessan dhiyeessitanitti biyya galmaa nuuf himaa.
Yes — the Construction 1.7m3 Wheel Loaders is regularly supplied against government, municipal and institutional tenders. Share the tender's technical specification, required quantity and delivery date, and we'll confirm compliance paperwork and a dispatch schedule that meets your submission deadline.




