
Construction Three-drum Mechanical Driven Static Road Roller
Construction Three-drum Mechanical Driven Static Road Roller yana amfani da ganguna uku na ƙarfe masu goge, yawanci ganguna biyu na baya tare da gangar gaba mai jujjuyawa, domin matsa saman hanya ta nauyi tsayayye kaɗai ba girgiza ba. Ana amfani da shi domin zagayen kammalawa a kan saman asphalt da macadam inda ake buƙatar saman mai goge, an rufe shi ba tare da alamun da gangar girgiza za ta iya barinsa ba. Nauyinsa tsayayye mai nauyi an rarraba shi a kan ganguna uku domin taɓawar ƙasa daidai. Winning bidders sourcing this for a tender can send us the award's specification and deadline for a matched configuration, compliance documentation and confirmed dispatch date.
- Atomatik da sarrafawa: Tuƙi na injina ko hydraulic, direba ke sarrafawa
- Ginin na'ura: Ganguna na ƙarfe masu goge, firam na ƙarfe
- Ƙarfi / tsarin aiki: Ganguna uku na ƙarfe masu goge, matsawa tsayayye (ba girgiza ba)
- Ƙarfin ɗauka na yau da kullun: Nauyin aiki tan 8-15
| Rukuni | Injina da Kayan Aikin Gine-gine |
| Ƙaramin Rukuni | Road Roller |
| Matakin Atomatik | Tuƙi na injina ko hydraulic, direba ke sarrafawa * |
| Ƙarfi / Tsarin Aiki | Ganguna uku na ƙarfe masu goge, matsawa tsayayye (ba girgiza ba) * |
| Kayan Ginin Na'ura | Ganguna na ƙarfe masu goge, firam na ƙarfe * |
| Ƙarfin Ɗauka / Girma | Nauyin aiki tan 8-15 * |
| Samuwa | Akwai a hannu / Ana yin bisa ga oda |
| Marufi na Fitarwa | Akwai marufin da ya dace da tafiyar ruwa |
| Garanti | Bisa ga sharuɗɗan mai ƙira — tabbatar a lokacin tambaya |
* Wannan ƙima ce ta yau da kullun ga irin wannan na'ura, ba adadi ne madaidaici daga takardar bayanan wani na'ura guda ba — tabbatar da ainihin ƙayyadaddun bayani na odarka a lokacin tambaya.
Kwatanta
Yadda wannan ke kwatanta da sauran kayayyakin Injina da Kayan Aikin Gine-gine makamantansu
| Model | Atomatik / Ƙarfi | Kayan Aiki | Ƙarfin Ɗauka |
|---|---|---|---|
| Construction Three-drum Mechanical Driven Static Road Roller (wannan shafin) | Tuƙi na injina ko hydraulic, direba ke sarrafawa | Ganguna na ƙarfe masu goge, firam na ƙarfe | Nauyin aiki tan 8-15 |
| Construction 18, 20, 22, 26 Ton Single Drum Frequency and Amplitude Modulation Vibratory Roller | Tuƙin hydraulic, sarrafawa daga keɓin direba/ROPS | Kwasfar ganga na ƙarfe, tayoyin tuƙi na roba | 26 ton |
| Construction Double Drum Static Road Rollers | Tuƙin injina, direba ke sarrafawa | Ganguna na ƙarfe masu goge, firam na ƙarfe | Nauyin aiki tan 6-12 |
| Construction Double-drum Mechanical Driven Static Road Roller | Tuƙin injina, direba ke sarrafawa | Ganguna na ƙarfe masu goge, firam na ƙarfe | Nauyin aiki tan 6-12 |
Wataƙila kana buƙatar
Kayayyakin Da Suka Shafi Wannan

Construction 18, 20, 22, 26 Ton Single Drum Frequency and Amplitude Modulation Vibratory Roller
Duba cikakkun bayanai →
Construction Double Drum Static Road Rollers
Duba cikakkun bayanai →
Construction Double-drum Mechanical Driven Static Road Roller
Duba cikakkun bayanai →
Construction Hydraulic Pedestrian Walk Behind Vibratory Road Roller
Duba cikakkun bayanai →Tambayoyin Masu Saye
Tambayoyi Game da Construction Three-drum Mechanical Driven Static Road Roller
Eh — yawanci ana iya daidaita ƙarfin ɗauka, ƙayyadaddun ƙarfi da kayan haɗi na Construction Three-drum Mechanical Driven Static Road Roller bisa ga buƙatarka. Ka gaya mana adadin da kake son samu da ƙasar da za a kai kaya lokacin da kake tambaya.
Ana marufa kowace kaya ta fitarwa domin ta jure yayin sufuri, kuma tana zuwa tare da takaddun jigila da ake buƙata; ana haɗa da littafin jagorar amfani inda ya dace. Ana tabbatar da sharuɗɗan taimakon shigarwa a lokacin yin oda.
Fitarwar wannan rukuni ta kai kasashe sama da 67 a Afirka, Asiya, Gabas ta Tsakiya da Amurka ta Kudu; ka gaya mana tashar jirgin ruwa ta inda za a kai kaya domin samun kimar farashin jigila.
Yes — the Construction Three-drum Mechanical Driven Static Road Roller is regularly supplied against government, municipal and institutional tenders. Share the tender's technical specification, required quantity and delivery date, and we'll confirm compliance paperwork and a dispatch schedule that meets your submission deadline.
